Description | View of open trench with laid main capped off; legend " 18in High Pressure Main East Lancashire Road Shows a length of 18in main in position with cap fixed ready for an air test. In the background is the Muihill shovel used for back-filling. In the mid-foreground the main deviates approximately 1ft out of line to pass round a sewer manhole. Joints used are Stanton-Wilson"; Ref M103; dated 26 October 1945 |